Published in: 2017
Publisher: 
SNUSP II Project
Author: 
GIZ
Uploaded by: 
				
SuSanA Admin				
Partner profile: 
				
common upload				
    			
    			2314 Views
    			57  Downloads
			
A collection of tools and reference material for the fourth step of the Public Toilet Management process and its focal areas is available for download here.
Focal Area: Monitoring Framework
• Monitoring parameters
• Quarterly report template to be submitted by the Operator to the Municipality
• Successful management practices in Public and Community Toilets
GIZ (2017). Toolbox for PTM Process Step 4 - Monitoring. SNUSP II Project
East Asia & Pacific English
Share this page on